Schedule of Rates
Price contract work against your Schedule of Rates
Import the client’s schedule, set the contract uplift once, and measure each job by code. Every line is priced and rounded the same way every time, so the total can be checked line by line.
| Code | Item | Rate | +3.5% | Qty | Total |
|---|---|---|---|---|---|
| AC0112 | Split indoor unit ≤3.5 kW | 312.40 | 323.33 | 2 | 646.66 |
| PP0204 | Pipework ¼″ + ⅜″, insulated · m | 48.60 | 50.30 | 14 | 704.20 |
| EL0310 | Isolator, 20 A double-pole | 64.15 | 66.40 | 1 | 66.40 |
| CD0118 | Condensate pump, mini | 138.00 | 142.83 | 1 | 142.83 |
| Measured total | £1,560.09 |
Three steps from spreadsheet to priced job
- 1
Import
Upload the schedule as a CSV or tab-separated export. Vento finds the header row under any title rows, maps the code, description, unit and rate columns, and takes up to 20,000 items.
- 2
Set the uplift
Apply the contract’s percentage once, against the whole schedule — “2026/27 plus 3.5%” — instead of editing every rate.
- 3
Measure
Search by code or description, add quantities, and the priced lines are saved to the job.
How a line is priced
Rounded to the penny, then multiplied
The uplifted rate is rounded before it meets the quantity, and the line is rounded again. A surveyor checking the job against the schedule gets the same number you did.
- Schedule rate
- £48.60
- × (1 + 3.5%)
- £50.301
- Rounded to the penny
- £50.30
- × 14 m
- £704.20
The details that matter on a contract
Awkward exports handled
Comma, tab, semicolon or pipe separated; descriptions that run over two lines; the byte-order mark Excel adds. Schedule descriptions are long, and exports are messy.
Codes stay unique
A code can only appear once in a schedule, regardless of case — AC0112 and ac0112 can’t both exist and quietly price differently.
Measured jobs keep their prices
When a line is added to a job, its rate and uplift are stored on the line. Update the schedule next year and jobs you’ve already measured don’t move.
Frequently asked questions
What is a Schedule of Rates?
A priced list of standard tasks — each with a code, description, unit and rate — that a client uses to value work under a contract. Social-housing and facilities contracts commonly use a published schedule such as the NHF Schedule of Rates, adjusted by a tendered percentage.
Can I use the NHF Schedule of Rates in Vento?
Yes, if you’re licensed to use it: import your copy as a spreadsheet export. Vento doesn’t supply the NHF, PSA or any other published schedule.
Is Schedule of Rates included in every plan?
Yes. It’s on every plan, with no per-schedule or per-job charge.
How are rounding differences avoided?
Each line’s adjusted rate is rounded to the penny before it’s multiplied by the quantity, and the line total is rounded again. The same rule is applied wherever the line appears, so the figure on screen is the figure saved to the job.
Contract work, priced properly.
Start your 14-day free trial and import your first schedule today.
Start free trial14-day free trial
More of what Vento does
One platform — these are the parts of it installers ask about most.
- Air conditioning softwareThe whole job: survey, design, quote, e-sign and get paid.Read more
- Installer softwareBuilt for engineers on site, not adapted from a generic trade CRM.Read more
- Quoting & estimatingPriced from the survey, with your own materials and margins.Read more
- Proposals & e-signBranded documents with drawings, signed on the customer's phone.Read more
- Heat loss calculationRoom-by-room sizing you can put in front of a customer.Read more
- F-Gas & logbookRegister, CO₂e totals and leak-check intervals, kept current.Read more
- Field service softwareDispatch, routes, van stock and subcontractors, after the job is won.Read more