Schedule of rates

Measure the job against the contract’s rates

Import the client’s schedule, set the contract uplift once, then add lines by code or description. Each rate is rounded to the penny before it’s multiplied out, so every total can be checked line by line.

How it works

  1. 1

    Load the schedule

    Import the client’s coded rates, or add codes by hand.

  2. 2

    Set your bid

    One percentage against the whole schedule, with your rate and margin on every code.

  3. 3

    Measure the job

    Find a code by number or description and measure it against the job.

The details

Published and yours

Each code shows the published rate beside the rate you’ll be paid.

Dayworks

Work that isn’t on the schedule can be added as dayworks.

Rates stay put

Re-bidding changes future measures; what’s already measured keeps its rate.

What it won’t do. NHF and PSA schedules are licensed — you import your own copy. Vento doesn’t supply them.

Frequently asked questions

Which plans include schedule of rates?

Every plan.

Related: Schedule of Rates software · Back office

Win more installs, with less admin.

Start your 14-day free trial — survey, design, quote and get paid on one platform.

Start free trial

14-day free trial

One platform — these are the parts of it installers ask about most.